Skip to main content
CAROzone Depleting Substances - U.S. - ARB ComplianceOHIO, USGeneral Methodologyv2.1

A-Gas 5-2020

CAR-1441 ↗

#140of 345 in United States#23of 72 in Climate Action Reserve (CAR)

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A-Gas 5-2020 is an ozone-depleting-substance destruction project in Ohio registered under the CAR registry for ARB compliance. The verification report confirms 78,211 ERR units with no material findings or corrective actions, and the claimed and verified figures match exactly. However, the available documentation is thin: no additionality test, baseline method, or leakage treatment is recorded, and the monitoring window covers only about six weeks of a ten-year crediting period.

Red Flags

  • No additionality assessment or test type is documented in the available records, despite the project relying on a specific ODS methodology (November 2014).
  • Baseline method and last reassessment date are not stated in any extracted document, making it impossible to independently verify the counterfactual.
  • Leakage deduction and justification are entirely absent from the record; for an ODS project this is less critical than for a carbon project but still an evidence gap.
  • The monitoring period (23 Jul – 4 Sep 2020) covers only roughly six weeks of the ten-year crediting period, and no ex-ante lifetime ERR estimate is available for pro-rata comparison.

Credit Vintages

IssuedRetiredAvailable
2020
78,211078,211
Total78,211078,211

Risk Indicators

Additionality

Not documented; ARB compliance context implies regulatory additionality but no explicit test recorded

Permanence

ODS destruction is inherently permanent; no reversal risk

Leakage

No leakage deduction or justification found in available documents

Baseline

Baseline method and reassessment date not stated in extracted record

Safeguards

FPIC, grievance mechanism, and safeguards not documented; US project context reduces risk

Double-claim

CORSIA and CCP status not stated; dual-channel risk not formally excluded

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents