Skip to main content
CAROzone Depleting Substances - U.S. - ARB ComplianceOHIO, USGeneral Methodologyv2.1

A-GAS RemTec 2013-5

CAR-1069 ↗

#45of 389 in United States#3of 72 in Climate Action Reserve (CAR)

6.2/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
7.0
Documentation
5.0

Audit Analysis

A-GAS RemTec 2013-5 is a California Air Resources Board (CAR) ozone-depleting substance destruction project in Ohio, verified by SES, Inc. The project's inherent permanence (irreversible destruction of CFCs/HCFCs) and the exact match between claimed and verified ERR (129,099) are strong positives, but the verification record contains two minor administrative findings and a large number of fields that are not stated in the available documents, limiting the depth of assurance.

Red Flags

  • Two material findings in the verification report: incorrect destruction dates for Plas-640 (Destruction Event #2) and a recovery company (Qualortran) omitted from the OPDR, though no corrective actions were required
  • One of the five evidence documents is listed as 'unknown', and minimum extraction confidence is only medium, reducing confidence in the completeness of the extracted record
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2014
129,1010129,101
Total129,1010129,101

Risk Indicators

Additionality

Compliance-driven; no formal test documented

Permanence

Irreversible destruction; no reversal risk

Leakage

No leakage pathway; substance destroyed

Baseline

Not explicitly stated in available documents

Safeguards

Not documented in extracted record

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents