A-GAS RemTec 2014-1
#132of 389 in United States#14of 72 in Climate Action Reserve (CAR)
Audit Analysis
A-GAS RemTec 2014-1 is a one-time ozone-depleting-substance destruction project under the CAR standard, verified by Ruby Canyon Engineering. The verified and claimed ERR figures match exactly at 129,838, and no contradictions were found across the four available documents. However, the extracted record is sparse on additionality, baseline, and safeguards details, and a minor chain-of-custody documentation gap was noted in the verification report.
Red Flags
- The verification report (2016) identified that the OPDR omits three points of origin (Chicago Masonic Center, Nebraska Medical Center, DuPont) from the chain-of-custody listing in Part VI, though no corrective actions were required.
- Additionality test type and VVB confirmation of additionality are not stated in any available document, leaving the additionality basis for the ODS destruction unverified in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 129,838 | 0 | 129,838 | |
| Total | 129,838 | 0 | 129,838 |
Risk Indicators
Not documented in extracted record
ODS destruction is irreversible
Not addressed; low inherent risk
Method not stated in documents
Not found in extracted record
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →