The A Luoi Hydro Power Project is a small hydro CDM project with a VVB-confirmed combined additionality test, a jurisdictional grid-emission-factor baseline, and no reversal risk inherent to the avoidance methodology. The main concerns are a significant discrepancy between the PDD and monitoring-report ERR figures, a contradiction in how the baseline method is characterised across documents, and a set of ten material findings (mostly minor corrections) that point to some sloppiness in the project documentation. Overall the project is sound but carries moderate data-reliability risk.
Red Flags
- ERR contradiction: the PDD (2015) states a total claimed reduction of 389,763 tCO₂ while the monitoring report (2014) states 700,608 tCO₂ — a factor of ~1.8× difference that is not explained in the extracted record
- Baseline method is described as 'jurisdictional' in the monitoring report but as 'project' in the validation report, creating ambiguity about whether the grid emission factor or a project-specific calculation underpins the baseline
- Ten material findings were logged during verification, including a temporary deviation in monitoring imported electricity for dam and intake areas and a permanent removal of a meter from the monitoring plan, indicating the MRV protocol was not fully stable at the time of verification
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 538,408 | 0 | 538,408 | |
| Total | 538,408 | 0 | 538,408 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
0% deemed negligible, consistent with hydro
Jurisdictional grid EF, method contradiction across docs
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.