AAC Block Project By Aerocon Buildwell PVt. Ltd. (Ekiesl- June 2016-02)
Score Breakdown
Integrity
verified The monitoring report states additionality was confirmed by the VVB and reports no material findings or corrective actions.
missing Baseline is project-specific and the timing of any baseline reassessment and the leakage deduction percentage are not stated in the extracted record.
Transparency
verified The project identifies the VVB (VKU Certification Pvt. Ltd.) and provides a clear monitoring period (2023-05-01 to 2024-07-14) with verified ERs reported.
missing The claimed ERs are not found in the extracted record and there are contradictions across documents on key disclosures (safeguards, grievance mechanism, FPIC).
Claim Safety
verified The project is explicitly not CORSIA-eligible, reducing certain downstream aviation-claim risks.
missing Contradictory verified ER figures and missing leakage deduction/usage monitoring details increase over-crediting and greenwashing risk.
Documentation
verified A relatively large document set was used (24) including PDD, validation, monitoring, issuance, and the latest monitoring report is dated 2025-03-06.
missing Extraction confidence is only medium and several key fields remain missing or inconsistent across documents.
Detailed Analysis
Integrity
The monitoring report (2025-03-06) indicates additionality was confirmed by the VVB and reports no material findings and no corrective actions. The baseline is described as project-specific, and the extracted record does not state when the baseline was last reassessed, which weakens baseline robustness. Leakage is described as quantified, but the monitoring/verification record provided here does not state the leakage deduction percentage, leaving uncertainty on whether leakage was conservatively treated. Buffer pool and reversal information are not found in the extracted record, which is a gap even for an avoidance project.
Transparency
The monitoring report (2025-03-06) provides a defined monitoring period (2023-05-01 to 2024-07-14) and reports verified emission reductions of 119,115 tCO2e. The VVB is named (VKU Certification Pvt. Ltd.), supporting traceability. However, the claimed emission reductions are not found in the extracted record, limiting the ability to check claimed-versus-verified consistency. Multiple contradictions between the validation and monitoring documentation on safeguards-related disclosures reduce transparency confidence.
Claim Safety
The extracted record states the project is not CORSIA-eligible, which lowers the risk of aviation-related double-claim pathways. At the same time, the verified ER quantity is contradictory across documents (119,115 vs 40,695), which elevates over-crediting/greenwashing risk because users cannot easily reconcile what was actually verified. Leakage is said to be quantified, but without a stated leakage deduction percentage and without usage monitoring details in the extracted record, it is hard to judge conservativeness. CCP status is not found in the extracted record, leaving uncertainty for high-integrity claims screening.
Documentation
The evidence set is reasonably broad (PDD, validation report, monitoring report, issuance) and the latest monitoring report is recent (2025-03-06), which supports documentation strength. The minimum extraction confidence is medium, implying some readability/structure limitations that can propagate missing fields. Several key quantitative items are not found in the extracted record (claimed ERs, leakage deduction percentage, baseline reassessment timing), reducing completeness. Contradictions between older validation documentation (2016-07-09) and the newer monitoring report (2025-03-06) also indicate record-management and consistency issues.
Overall
Key contradictions materially affect confidence: (1) safeguards, grievance mechanism, benefit sharing, and FPIC are reported as present in the monitoring report (2025-03-06) but absent in the validation report (2016-07-09); I privilege the newer monitoring report for current practice, but the inconsistency suggests weak continuity of safeguards documentation and lowers scores. (2) Additionality test type conflicts (barrier vs investment); I privilege the validation report’s additionality framing where available because it is the primary additionality assessment document, and the inconsistency reduces integrity/claim-safety. (3) Verified ERs conflict (119,115 vs 40,695); I privilege the higher, more recent figure (2021-10-22 document date) as likely reflecting later issuance/verification, but the discrepancy is a major reliability red flag and drives a downward adjustment across transparency and claim safety. Gate rules to note: documentation is above 3.0 so no transparency cap is triggered; integrity is above 4.0 so no overall cap is triggered.
Audit Analysis
The project has some core integrity elements in place (VVB-confirmed additionality and a quantified leakage approach), and recent monitoring documentation reports no material findings. However, key quantitative fields are missing (claimed ERR, leakage deduction, baseline reassessment timing), and multiple cross-document contradictions reduce confidence in the reliability of the record.
Project Description
Aerocon Buildwell Pvt. Ltd (ABPL) is a manufacturing company based in Ujjain, India that specializes in Autoclaved Aerated Concrete (AAC) blocks/panels. Their current project aims to produce 150,000 cubic meters of AAC blocks using fly ash from thermal plants mixed with lime, cement, gypsum, and aluminum powder to create energy-efficient bricks. This technology allows the blocks to acquire the necessary mechanical properties without being sintered.
Red Flags
- Verified emission reductions are inconsistent across documents (119,115 vs 40,695), creating over-/under-crediting and reporting reliability risk.
- Additionality approach is contradictory between documents (barrier vs investment test), weakening confidence in additionality robustness.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 7,264 | 7,264 | 0 | |
| 2015 | 21,216 | 21,216 | 0 | |
| 2016 | 12,215 | 12,215 | 0 | |
| 2017 | 30,596 | 30,596 | 0 | |
| 2018 | 57,218 | 57,218 | 0 | |
| 2019 | 60,180 | 60,180 | 0 | |
| 2020 | 53,508 | 53,508 | 0 | |
| 2021 | 21,727 | 3,575 | 18,152 | |
| 2022 | 20,808 | 0 | 20,808 | |
| 2023 | 10,331 | 0 | 10,331 | |
| 2024 | 4,515 | 15 | 4,500 | |
| Total | 299,578 | 245,787 | 53,791 |
Cosa migliorerebbe questo punteggio
- Provide a reconciled ER table (claimed vs verified vs issued) for the monitoring period and explain the 119,115 vs 40,695 discrepancy with document references.
- Disclose the leakage deduction percentage and calculation details, and document baseline reassessment timing/updates to strengthen conservativeness and auditability.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed but test type inconsistent across documents
Avoidance project but buffer/reversal details not evidenced in extracted record
Leakage said to be quantified but deduction value not stated
Project-specific baseline; reassessment timing not evidenced
Safeguards/FPIC/grievance reported later but contradicted by validation
Not CORSIA-eligible; CCP status not evidenced
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →