Vai al contenuto principale
VCS Manufacturing industries India Registry: Registered Documentazione completa General Methodology v2.0

AAC Block Project By HIL Limited

VCS-1673 ↗

5.2 / 10
Integrity
6.2
Transparency
4.1
Claim Safety
5.0
Documentation
5.2

Score Breakdown

Integrity

verified Additionality was tested using a barrier approach and was confirmed by the VVB in the project document.

missing Leakage deduction, buffer pool coverage, and any reversal history are not stated in the available documents.

Transparency

verified The project document provides a defined monitoring period and crediting period, which helps establish temporal scope.

missing The VVB name, verified issuance figures, and usage monitoring method are not found in the extracted record.

Claim Safety

verified The project uses a project-specific baseline and a recognized VCS methodology, which is better than having no baseline information.

missing No verified error reduction, leakage percentage, or usage-rate evidence is available, so over-crediting risk cannot be tightly bounded.

Documentation

verified The record shows three documents used, with no material findings or corrective actions required in the extracted PDD.

missing Extraction confidence is only medium, and one evidence document is unidentified, leaving gaps in documentation completeness.

Detailed Analysis

Integrity

The project document supports additionality through a barrier test, and that assessment was confirmed by the VVB. FPIC and a grievance mechanism are also documented, which strengthens the safeguards side of integrity. On the other hand, leakage is only described as quantified without the actual deduction rate, and buffer pool coverage or reversal events are not stated in the available record.

Transparency

Transparency is limited by missing operational and registry details. The extracted record does not identify the VVB, does not provide verified issuance or claimed-versus-verified error figures, and does not state the usage monitoring method. The monitoring and crediting periods are clear, but the overall MRV picture remains incomplete.

Claim Safety

Claim safety is moderate because the project uses a recognized VCS methodology and a project-specific baseline, but the evidence base is thin on over-crediting controls. The record does not state verified error reductions, leakage deduction percentage, or usage-rate evidence, so the risk of overstated claims cannot be ruled out. CORSIA eligibility and CCP status are not stated, which adds uncertainty rather than reassurance.

Documentation

Documentation quality is middling: three documents were used, and the extracted PDD reports no material findings or corrective actions. Still, extraction confidence is only medium, and one evidence document is unidentified, which reduces confidence in completeness. The project document is dated 2017, so the evidence is not especially recent relative to the full crediting period.

Overall

The project shows a credible additionality narrative and some safeguard documentation, but the evidence is too incomplete to rate it highly. There are no explicit contradictions in the extracted record, so no document had to be privileged over another; instead, the main issue is missing data, especially around leakage, permanence, and issuance verification. Because several key fields are not stated, the score is held to a mid-range level rather than a stronger one.

Audit Analysis

The project has some positive integrity signals, including a VVB-confirmed barrier additionality test, FPIC, and a grievance mechanism. However, key elements needed to judge credit quality are missing or not stated in the available record, especially leakage quantification, permanence protections, and verified issuance/usage figures.

Project Description

Proponent: Hyderabad Industries Limited Protocol categories: Manufacturing industries Protocols: AMS-III.Z Estimated annual GHG reductions: 21636 tCO2e Region: Asia Registration date: 2021-05-05

Red Flags

  • Leakage is described as quantified, but the actual deduction percentage is not stated in the available documents.
  • No verified error reduction or claimed-versus-verified issuance figures were found, limiting confidence in over-crediting risk assessment.

Credit Vintages Exhausted

Issued Retired Available
2015
2,676 2,676 0
2016
21,492 21,492 0
2017
8,287 8,287 0
Total 32,455 32,455 0

Cosa migliorerebbe questo punteggio

  • Publish the leakage deduction percentage, buffer pool treatment, and any reversal monitoring results in a verification report.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

Barrier test VVB-confirmed

Permanence

No reversal or buffer details stated

Leakage

Quantified but deduction not stated

Baseline

Project baseline, reassessment timing missing

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-14 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti