Abatement of Green House Gas (GHG) emissions through biomass residue based cogeneration at Claris Lifesciences Limited
#39of 196 in Biomass#171of 387 in India#66of 213 in CDM (UNFCCC)#12of 42 in AMS-I.C
Audit Analysis
A CDM biomass cogeneration project in India with VVB-confirmed additionality and a reasonable lignite baseline, but burdened by nine material findings, eleven corrective actions, and multiple inter-document contradictions. The project delivered roughly 75% of its pro-rata emission-reduction expectation for the monitored period, and key MRV parameters (verified ERR, FNRB, usage rates) remain unstated in the extracted record.
Red Flags
- Nine material findings in the verification report, including design changes (turbine and boiler upgrades), baseline calculations initially not documented on a project-specific basis, and monitoring plan gaps (steam enthalpy, surplus biomass availability)
- Eleven corrective actions required by the National CDM Authority, including rectification of thermal capacity, modification of baseline and monitoring plans, and a restriction on selling CERs to ODA-funded buyers
- Crediting period start date initially predated registration (2008-07-01 in validation report vs. 2009-02-21 in monitoring report), indicating a compliance timing issue that was later corrected
- No verified ERR figure, FNRB method, or usage monitoring method found in the extracted record, limiting independent verification of claimed reductions
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 30,602 | 0 | 30,602 | |
| 2012 | 75,032 | 0 | 75,032 | |
| 2013 | 49,397 | 0 | 49,397 | |
| 2014 | 58,880 | 0 | 58,880 | |
| Total | 213,911 | 0 | 213,911 |
Risk Indicators
VVB-confirmed investment test
No buffer pool; no reversal data
0% deduction, quantified justification
Project-specific, reassessed 2013
Mentioned but not detailed
CCP/CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →