Abu Dhabi solar thermal power project, Masdar
#8of 9 in United Arab Emirates#1376of 1459 in CDM (UNFCCC)#1201of 1287 in ACM0002
Audit Analysis
The Abu Dhabi solar thermal project (CDM-2534) has a VVB-confirmed additionality assessment but is undermined by three material contradictions across the grid emission factor, baseline method, and leakage treatment. No monitoring or verification data is available for the 2011–2018 crediting period, and the low extraction confidence further limits assurance. The project's claimed reductions of ~1.22 million tCO₂e rest on parameters that are internally inconsistent across documents.
Red Flags
- Grid emission factor contradicts between 0.881 (validation report) and 0.42 (unidentified appendix), a factor-of-two discrepancy that would halve the claimed reductions
- Baseline method is described as 'project-specific' in the validation report but 'jurisdictional' in the PDD, creating ambiguity about the fundamental reduction calculation
- Leakage is stated as 'deemed negligible' in the validation report but 'quantified' in an appendix, with no reconciliation provided
- No monitoring report or verified ERR figure is available for the entire 2011–2018 crediting period
- Seven corrective action requests were raised during validation, indicating the initial PDD had significant gaps in additionality evidence, emission calculations, and monitoring parameters
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction but contradictory appendix
Method contradicts between documents
Mentioned but not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →