Active Synergy Landfill Gas Power Generation Project Nakhon Pathom
#15of 189 in Methane#10of 48 in Thailand#266of 1459 in CDM (UNFCCC)#4of 34 in AMS-III.G
Audit Analysis
A CDM landfill gas project in Thailand with VVB-confirmed additionality and a reasonable leakage treatment, but hampered by a project-specific baseline with a measured-vs-modeled contradiction, several key data fields left unstated (FNRB, usage rates, CORSIA/CCP status), and a notably high pro-rata delivery rate in the first monitoring period. The project is procedurally sound but data-thin for a full quality assessment.
Red Flags
- Baseline characterization contradicts between the validation report (modeled) and the monitoring report (measured), creating uncertainty about the robustness of the baseline
- The first monitoring period (6.5 months) reports 7,628 tCO2e, which is approximately 793% of the pro-rata expectation (~963 tCO2e) derived from the 17,890 tCO2e ex-ante estimate over the 10-year crediting period — while explainable for early-stage landfill gas, the magnitude warrants scrutiny
- No buffer pool percentage, FNRB value, usage monitoring method, or CORSIA/CCP eligibility status is stated in any available document
- Five material findings at validation (missing LoAs, grid boundary omission, outdated methane tool, missing monitoring frequency, missing emergency procedures) indicate initial documentation gaps, all subsequently corrected
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 7,628 | 0 | 7,628 | |
| Total | 7,628 | 0 | 7,628 |
Risk Indicators
VVB-confirmed barrier test
no reversal events reported
0% deduction, deemed negligible (source capture)
Project-specific; measured vs modeled contradiction
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →