The ADFEC 10 MW Solar Power Plant is a straightforward grid-connected solar project under CDM with a jurisdictional baseline and VVB-confirmed combined additionality test. Six corrective action requests were raised during validation but all were resolved before registration. The first monitoring period shows approximately 94% delivery against the pro-rata lifetime expectation, indicating a well-calibrated baseline.
Red Flags
- Six material findings (CARs) were raised during validation covering additionality substantiation, baseline identification, grid emission factor transparency, and monitoring procedures — all resolved but indicating initial documentation gaps
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
- Safeguards are mentioned and benefit sharing is described, but FPIC and grievance mechanism details are not found in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 11,786 | 0 | 11,786 | |
| Total | 11,786 | 0 | 11,786 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversals
0% deduction, justified as negligible
Jurisdictional grid EF, 2008
Mentioned, FPIC/grievance not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →