ADFEC 10 MW Solar Power Plant.

CDM-2444 ↗

#63of 1935 in Renewable energy#1of 9 in United Arab Emirates#40of 1459 in CDM (UNFCCC)#22of 806 in AMS-I.D

6.8/ 10
Integrity
7.0
Transparency
6.0
Claim Safety
7.0
Documentation
7.0

Audit Analysis

The ADFEC 10 MW Solar Power Plant is a straightforward grid-connected solar project under CDM with a jurisdictional baseline and VVB-confirmed combined additionality test. Six corrective action requests were raised during validation but all were resolved before registration. The first monitoring period shows approximately 94% delivery against the pro-rata lifetime expectation, indicating a well-calibrated baseline.

Red Flags

  • Six material findings (CARs) were raised during validation covering additionality substantiation, baseline identification, grid emission factor transparency, and monitoring procedures — all resolved but indicating initial documentation gaps
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
  • Safeguards are mentioned and benefit sharing is described, but FPIC and grievance mechanism details are not found in the extracted record

Credit Vintages

IssuedRetiredAvailable
2011
11,786011,786
Total11,786011,786

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversals

Leakage

0% deduction, justified as negligible

Baseline

Jurisdictional grid EF, 2008

Safeguards

Mentioned, FPIC/grievance not detailed

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D. Grid connected renewable electricity generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents