Adiguzel II Hydroelectric Power Plant
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test, which supports the project’s core eligibility case.
missing Leakage is marked as not addressed in the monitoring report, and no buffer pool or reversal history is stated in the extracted record.
Transparency
verified The project has a named VVB, a defined monitoring period, and a substantial set of extracted official documents.
missing The monitoring report includes many corrective action requests, and the record does not state CORSIA eligibility or usage monitoring details.
Claim Safety
verified The project uses ACM0002 under VCS, which is a recognized methodology for grid-connected renewable energy projects.
missing The emission reduction figures conflict materially between validation documents, and leakage treatment is inconsistent across documents.
Documentation
verified The extraction drew on multiple official document types, including validation, monitoring, PDD, and issuance records.
missing The monitoring report required numerous corrections, including template, calculation, and methodology-reference fixes, indicating documentation quality problems.
Detailed Analysis
Integrity
The project’s additionality case is stronger than average because the VVB confirmed an investment test. Still, integrity is weakened by the absence of a stated buffer pool, no reported reversal history, and leakage being left unaddressed in the monitoring report. The project is an avoidance activity, which helps on permanence, but the accounting weaknesses keep the score below mid-range.
Transparency
Transparency is mixed: the record identifies BM Certification as the VVB and provides a monitoring period from 2020-10-01 to 2025-01-23. However, usage monitoring details are not found in the extracted record, CORSIA eligibility is not stated, and the monitoring report contains many corrective action requests that suggest incomplete or messy reporting. The documentation is therefore usable but not especially clean.
Claim Safety
Claim safety is reduced by the large discrepancy in verified emission reductions across validation documents, where the later validation record shows 52,448 while the earlier one shows 166,012. I privileged the later validation figure because it is more recent, but the contradiction itself lowers confidence in the claimed volume. Leakage is also inconsistent: the monitoring report says it is not addressed, while the validation record says it was quantified, which raises over-crediting risk.
Documentation
Documentation breadth is decent because the extraction includes validation, monitoring, PDD, and issuance materials, and the extraction confidence is high. Even so, the monitoring report lists many corrective action requests, including missing validation details, methodology references, calculation issues, and formatting problems. That suggests the file set is complete enough to review, but not clean or fully polished.
Overall
I privileged the later validation report for the emission reduction figure because it is more recent, but the contradiction with the earlier validation report remains a serious reliability issue. I also privileged the monitoring report for safeguards and leakage treatment because it is the latest operational document, even though it conflicts with the validation record on those points. The project’s overall profile is weakened by these contradictions, by the lack of clear leakage treatment in the monitoring report, and by extensive corrective actions, though the VVB-confirmed additionality and documented safeguards prevent a very low score.
Audit Analysis
This project has some positive signs, including VVB-confirmed investment-test additionality and documented safeguards in the monitoring report. However, the record shows major reliability issues: the verified emission reductions differ sharply across validation documents, leakage is not addressed in the monitoring report, and the monitoring report contains many corrective action requests. Overall, the crediting claim should be treated cautiously.
Project Description
The project aimed to install a hydro power plant with a total installed capacity of 30.09 MW in the Egea Region, Denizli Province of Turkey. The generated electricity was fed to the national grid, qualifying the project as a "Project" according to the VCS Standard.
Red Flags
- Verified emission reductions are inconsistent across validation documents, with 52,448 cited in the later validation record versus 166,012 in the earlier one.
- The monitoring report says leakage is not addressed, while the validation record says it was quantified, creating a material inconsistency in project accounting.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 31,208 | 31,208 | 0 | |
| 2016 | 41,083 | 41,083 | 0 | |
| 2017 | 30,294 | 30,294 | 0 | |
| 2018 | 21,506 | 21,506 | 0 | |
| 2019 | 22,219 | 22,219 | 0 | |
| 2020 | 19,702 | 19,702 | 0 | |
| Total | 166,012 | 166,012 | 0 |
Cosa migliorerebbe questo punteggio
- Publish a reconciled emissions accounting note that explains the discrepancy between the two validation figures and clearly states the final verified amount.
- Provide a complete leakage assessment, including the basis for any deduction, and clean up the monitoring report to resolve all corrective action requests.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
avoidance project, but buffer not stated
inconsistent leakage treatment
project baseline stated, reassessment not found
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →