Skip to main content
CDMBiomass EnergyThailandAMS-I.D

Advance Agro Power Plant AAPP 1 Biomass Power Generation

CDM-8913 ↗

#126of 352 in Biomass#28of 48 in Thailand#928of 1459 in CDM (UNFCCC)#394of 806 in AMS-I.D

4.8/ 10
Integrity
6.0
Transparency
3.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A CDM biomass power project in Thailand with a VVB-verified investment additionality test and a standard jurisdictional grid baseline, but significant gaps in monitoring data, feedstock sustainability documentation, and safeguards. The project delivered its validation in 2012 with 21 material findings all resolved, yet no verified emission reductions or monitoring period data are available in the extracted record, limiting confidence in actual delivery.

Red Flags

  • No verified emission reduction figures or monitoring period data found in any available document, making it impossible to confirm actual delivery against the 379,400 tCO2e lifetime claim
  • Feedstock sustainability criteria (sustainable biomass sourcing, no deforestation linkage) are not documented in any extracted record
  • No FPIC or grievance mechanism documented despite safeguards being mentioned
  • Grid emission factor dated 2009 with no evidence of periodic baseline update over the 10-year crediting period
  • Low extraction confidence across the document set, with one document of unknown type

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justified but minor contradiction

Baseline

Jurisdictional, grid EF from 2009, no update evidence

Safeguards

Mentioned but no FPIC or grievance mechanism

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS I D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents