Advance Asia Power Plant ASPP 1 Biomass Power Generation
#196of 352 in Biomass#37of 48 in Thailand#1226of 1459 in CDM (UNFCCC)#496of 806 in AMS-I.D
Audit Analysis
A CDM biomass energy project in Thailand with a verified investment-test additionality and jurisdictional baseline, but severely limited by the absence of any monitoring or verification data, a low-confidence extraction, and a contradiction in the leakage justification. The project's 10-year crediting period ended in December 2022, yet no post-validation or monitoring documents are available to confirm actual delivery against the 379,400 tCO₂e lifetime claim.
Red Flags
- No monitoring reports or verified ERR figures are available in the extracted record, making it impossible to confirm whether the 379,400 tCO₂e lifetime claim was actually delivered.
- Contradiction between the validation report (leakage 'deemed negligible') and an appendix (leakage 'quantified') creates ambiguity about whether leakage was truly zero or merely small.
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines confidence in all extracted facts.
- No feedstock sustainability, carbon content testing, or storage verification data is present, leaving the biomass supply chain unverified.
- Grid emission factor is from 2009 and no baseline reassessment date is recorded, so the baseline may be outdated relative to Thailand's evolving grid mix.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified investment test
No reversal data; avoidance-type project
0% deduction; contradictory justification
Jurisdictional; 2009 grid EF; no reassessment date
Mentioned; benefit sharing; no FPIC or grievance data
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →