VCS Energy industries (renewable/non-renewable sources) India Registry: Registered Documentazione completa General Methodology v2.0

AES Saurashtra Windfarms

VCS-1039 ↗

6.2 / 10
Integrity
6.4
Transparency
6.1
Claim Safety
6.0
Documentation
6.2

Score Breakdown

Integrity

verified Additionality was tested using an investment test and was confirmed by the VVB in the validation report.

missing Leakage treatment is inconsistent across documents, and reversal risk is not addressed beyond an unspecified statement that reversals were not reported.

Transparency

verified The project has a named VVB and multiple official documents in the extracted record, including validation, monitoring, PDD, and issuance materials.

missing Several operational details are not stated in available documents, including the monitoring method for usage and the year for the grid emission factor.

Claim Safety

verified The project is marked as not CORSIA-eligible, which reduces one channel of dual-claim risk.

missing The baseline is project-specific rather than jurisdictional, and the record contains major contradictions in reported emission reductions across validation documents.

Documentation

verified The extraction draws on 17 documents and the extraction confidence is high.

missing The monitoring report itself lists multiple corrective actions, including missing technical equipment evidence, missing breakdown support, and a need to clarify the crediting period.

Detailed Analysis

Integrity

The validation report confirms additionality through an investment test, and the VVB is identified as LGAI Technological Center, S.A. (Applus+ Certification). The monitoring report reports no material findings, but it also flags missing supporting evidence for equipment details, breakdown records, and site practice documentation, which weakens the robustness of the project file. Leakage is described as deemed negligible in the monitoring report, yet the validation report says it was not addressed, so the integrity score is held to a moderate level.

Transparency

The project has a reasonably broad document set, including validation, monitoring, PDD, and issuance materials, and the monitoring period is clearly stated. Still, several transparency-relevant fields are not stated in available documents, including the usage monitoring method and the year for the grid emission factor. The record also shows that the crediting period was described differently in different documents, which reduces clarity.

Claim Safety

Claim safety is helped by the fact that the project is explicitly marked as not CORSIA-eligible, lowering dual-market risk. On the other hand, the baseline is project-specific rather than a more conservative standardized or jurisdictional approach, and the record contains large contradictions in reported emission reductions between validation documents. Because the later validation report is more recent, it is privileged for the emission totals, but the inconsistency still raises over-crediting and reliability concerns.

Documentation

Documentation quality is decent because the extraction used 17 documents and the extraction confidence is high. The project also has a named VVB and a monitoring report with detailed findings. However, the monitoring report lists several corrective actions, including missing technical evidence and unresolved clarification on the crediting period, which prevents a higher score.

Overall

The later validation report is privileged for the emission reduction totals because it is more recent than the earlier validation report, but the contradiction itself is a reliability concern and lowers confidence. The later monitoring report is also privileged for safeguards and leakage because it is more recent and operationally specific, yet the earlier validation report’s contrary statements show that these issues were not consistently documented. Overall, the project looks moderately credible but not strong enough to score highly because of documentation gaps, inconsistent leakage treatment, and conflicting reported figures.

Audit Analysis

This is a registered VCS wind project with VVB-confirmed additionality and no material findings reported, which supports a moderate integrity profile. However, several key items are either not stated or inconsistent across documents, including crediting period dates, leakage treatment, and reported emission reductions, which weakens confidence in the claim quality.

Project Description

Proponent: Tata Power Renewable Energy Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 80385 tCO2e Region: Asia Registration date: 2013-04-16

Red Flags

  • The extracted record shows large contradictions in reported emission reductions between validation documents, including a much higher verified and claimed total in the later report.
  • Leakage is described as negligible in the monitoring report, but the validation report says it was not addressed, and the crediting period dates also conflict across documents.

Credit Vintages

Issued Retired Available
2012
16,951 0 16,951
2013
67,741 0 67,741
2014
68,353 0 68,353
2015
75,440 0 75,440
2016
69,274 0 69,274
2017
68,486 0 68,486
2018
62,241 0 62,241
2019
64,592 0 64,592
2020
57,591 0 57,591
2021
23,082 109 22,973
Total 573,751 109 573,642

Cosa migliorerebbe questo punteggio

  • Provide a reconciled emissions statement that explains the differences between the validation reports and clearly identifies the authoritative figure.
  • Submit missing operational evidence, including equipment specifications, O&M agreements, breakdown support, and a clear, consistent crediting period record.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversal evidence, but buffer not stated

Leakage

Negligible claim, but inconsistent documentation

Baseline

Project baseline, reassessment not stated

Safeguards

FPIC and grievance mechanism documented

Double-claim

Not CORSIA-eligible

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-14 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti