Afcon E.B Wind Energy "Sirin" & "Gilboa" Grid Connected Wind Farms
#1593of 1935 in Renewable energy#8of 8 in Israel#1378of 1459 in CDM (UNFCCC)#1202of 1287 in ACM0002
Audit Analysis
A CDM wind project in Israel with a VVB-confirmed investment additionality test and inherently low permanence risk, but the available record is limited to a 2010 validation report with six material findings (including a grid emission-factor calculation error) and no monitoring or verification data for the full 2012–2022 crediting period. Two inter-document contradictions (baseline method and leakage treatment) and low extraction confidence further erode confidence in the data.
Red Flags
- Six material findings at validation, including an incorrect grid emission-factor calculation and missing sensitivity analysis, all requiring corrective action before registration
- No monitoring reports or verification reports available for the entire 2012–2022 crediting period; total verified ERR is not stated in any available document
- Contradiction between the validation report (baseline = project-specific) and the PDD (baseline = jurisdictional) undermines confidence in the baseline methodology
- Low extraction confidence across the document set, indicating at least one key document was poorly readable
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, negligible for wind
Contradictory method, 2008 grid EF with calc error
Mentioned, benefit sharing described, no FPIC/grievance deta
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →