Agriwaste Based Biogas Project at APMC, Vadodara, Gujarat
#105of 111 in Biogas#408of 421 in Universal Carbon Registry (UCR)#21of 23 in AMS-II.I
Audit Analysis
This UCR-registered agriwaste biogas project in Vadodara, Gujarat has a defined design (PDD) referencing two AMS methodologies, but the available record contains only that single design document. No verification report, monitoring report, or VVB assessment was found, leaving additionality, leakage, permanence, and verified emission reductions entirely unconfirmed. The project cannot be assessed as robustly designed or credibly delivered based on the evidence at hand.
Red Flags
- No verification body (VVB) identified in any available document; additionality was never confirmed by an independent verifier
- No leakage deduction or justification documented for a biogas project where displaced-fuel and agricultural-practice leakage are plausible
- No permanence mechanism (buffer pool, reversal contingency) documented despite inherent biogas-plant decommissioning risk
- Only a Project Design Document is available; no verification report, monitoring report, or VVB audit trail exists in the record
- Total verified ERR is absent — the 68,249 tCO₂e figure is an ex-ante claim with no independent confirmation
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB confirmation found
No buffer pool or reversal contingency documented
No leakage deduction or justification stated
Project-specific baseline; no reassessment date
Safeguards mentioned; FPIC and grievance mechanism not docum
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →