Skip to main content
UCRIndiaAMS-II.I

Waste to Energy project – Energy BinTM by XWMPL

UCR-296 ↗

#366of 387 in India#374of 421 in Universal Carbon Registry (UCR)#19of 23 in AMS-II.I

2.8/ 10
Integrity
3.5
Transparency
1.0
Claim Safety
4.0
Documentation
2.0

Audit Analysis

This UCR-registered biogas project (Xeon Biogas, India) claims 7,406 tCO₂e over a ~4-year crediting period, but the available record consists solely of a PDD with no verification report, monitoring report, or identified VVB. The absence of additionality documentation, permanence mechanisms, and any verified emissions data makes it impossible to confirm the integrity or accuracy of the claimed credits.

Red Flags

  • No verification report or monitoring report is available; the only document is a PDD, leaving all claims unverified
  • The PDD is dated 2022-07-29, approximately two months AFTER the crediting period end date of 2022-06-05, raising questions about whether documentation was prepared retrospectively
  • No VVB (Verification and Validation Body) is identified in the available record, and no additionality test type or VVB confirmation is documented
  • No buffer pool, permanence mechanism, or reversal-risk mitigation is stated for a project whose credits depend on continued biogas capture
  • Leakage is set at 0% on the basis of 'deemed negligible' with no quantified assessment or supporting calculation

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test or VVB confirmation found

Permanence

No buffer pool or permanence mechanism stated

Leakage

0% deduction, 'deemed negligible' without quantification

Baseline

Project-specific baseline, no reassessment date

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available record

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-20AMS III-AO

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents