Skip to main content
CDMHydroColombiaAMS-I.D

Agua Fresca Multipurpose and environmental services project

CDM-0122 ↗

#1551of 1935 in Renewable energy#112of 124 in Colombia#1343of 1459 in CDM (UNFCCC)#525of 806 in AMS-I.D

4.0/ 10
Integrity
3.5
Transparency
3.8
Claim Safety
5.2
Documentation
3.2

Audit Analysis

A CDM-registered grid-connected hydro project in Colombia with a jurisdictional baseline and a 7-year crediting period (2020–2026), validated by Colombia's national standards body ICONTEC. The project carries three material findings related to PDD documentation gaps and inconsistent energy-generation data, and the extracted record lacks critical information on additionality testing, monitoring methodology, and FNRB. Overall, the project design is sound for a renewable-energy credit, but the documentation and transparency record is thin and the low extraction confidence limits confidence in the assessment.

Red Flags

  • Three material findings in the validation report, including inconsistent energy-generation data for six power plants in the 2019 spreadsheet (CAR 1), raising data-quality concerns for the ERR calculation.
  • No monitoring period, FNRB method, or usage-monitoring method is stated in the extracted record, leaving the MRV chain incomplete.
  • Additionality test type and VVB confirmation are not stated in the extracted data, a core CDM requirement that cannot be independently confirmed from the available documents.
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable and the full evidentiary picture may be incomplete.

Credit Vintages

IssuedRetiredAvailable
2009
20,015020,015
2011
50,155050,155
2012
29,454029,454
2013
28,879028,879
2019
44,437044,437
2023
19,068019,068
Total192,0080192,008

Risk Indicators

Additionality

Not stated in extracted record; validation report exists but

Permanence

no reversal events confirmed; hydro a

Leakage

0% deduction with quantified justification; reasonable for g

Baseline

Jurisdictional baseline, grid EF 0.1829 (2019), reassessed 2

Safeguards

Safeguards mentioned; benefit sharing described; no FPIC or

Double-claim

CORSIA and CCP status not stated; dual-channel risk unassess

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D: Grid connected renewable electricity generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents