Ahebulong 1st Level Hydro Power Project
#104of 1935 in Renewable energy#24of 1084 in China#59of 1459 in CDM (UNFCCC)#72of 1287 in ACM0002
Audit Analysis
A straightforward small-hydro CDM project in China using the standard ACM0002 methodology, with VVB-confirmed additionality and a jurisdictional grid baseline. The project is low-risk in terms of permanence (avoidance-type, no reversal exposure) and leakage (reasonably deemed negligible), but the verified ERR figure is absent from the extracted record and a baseline-method contradiction between the PDD and monitoring report introduces a minor data-reliability concern.
Red Flags
- Baseline method is described as 'project' in the PDD (2012) but 'jurisdictional' in the monitoring report (2022) — a contradiction that, while resolvable in favour of the more recent verification document, signals inconsistent project documentation.
- Total verified ERR is not present in the extracted record, preventing an independent cross-check of the 379,604 tCO2e lifetime claim against actual monitored output.
- 15 Corrective Action Requests were raised during verification (all subsequently closed), indicating a non-trivial number of initial documentation or calculation issues.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance-type, no reversal risk
0% deemed negligible, justified
PDD vs MR contradiction on type
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →