Akhfennir Wind Farm Project
#344of 1935 in Renewable energy#1of 12 in Morocco#214of 1459 in CDM (UNFCCC)#255of 1287 in ACM0002
Audit Analysis
The Akhfennir Wind Farm is a CDM-registered wind project in Morocco with a VVB-confirmed combined additionality test and a jurisdictional grid-emission-factor baseline. The project delivered roughly 78% of its pro-rata expected reductions in the first monitoring period, and the validation process surfaced 24 corrective actions (all addressed) plus two minor outstanding items. Several key transparency fields (FNRB, usage monitoring, CORSIA/CCP status) are not stated in the available documents, limiting full assessment.
Red Flags
- Grid emission factor of 0.7005 tCO2/MWh is anchored to 2008 data; if Morocco's grid has decarbonised since, the baseline may overstate actual reductions
- 24 corrective actions were raised during validation, including financial calculation errors and sensitivity-analysis parameter adjustments to reach the benchmark rate, indicating the initial PDD required substantial revision
- Two corrective actions remain open (PDD template version and EGfacility,y accuracy class/calibration frequency), suggesting minor documentation gaps persist
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 396,952 | 0 | 396,952 | |
| Total | 396,952 | 0 | 396,952 |
Risk Indicators
VVB-confirmed combined test
Wind generation; no reversal risk
0% with negligible justification
Jurisdictional but 2008 grid EF; no reassessment date
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →