AKKENT-ÇALKUYUCAK HYDROELECTRIC POWER PLANT
#294of 1935 in Renewable energy#66of 295 in Turkey#145of 1339 in Verra (VCS)#111of 806 in AMS-I.D
Audit Analysis
A small hydroelectric project in Turkey using the standard AMS-I.D methodology with a jurisdictional grid baseline. The verification report confirms that actual reductions were 68.2% below the ex-ante estimate due to lower rainfall, meaning the project is conservatively reporting verified actuals rather than over-crediting. Key gaps include the absence of an explicitly stated additionality test type and several safeguards details, but the project type carries inherent permanence advantages.
Red Flags
- The verification report (2023) reports that actual emission reductions were 68.2% lower than the ex-ante estimate due to lower rainfall between 2013 and 2019, indicating the original project design assumptions were significantly optimistic.
- Additionality test type and VVB confirmation of additionality are not stated in the extracted record, creating an evidence gap on a fundamental VCS requirement.
- Three corrective actions were required by the VVB, including a discrepancy in ex-ante emission reduction figures between the Excel worksheet and the monitoring report, and an untraceable change in installed capacity.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not stated in extracted record
Avoidance project; no reversal risk
0% deemed negligible; reasonable for hydro
Jurisdictional grid EF; standard approach
Grievance mechanism and benefit sharing present; FPIC not confirmed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →