Akres Wind Power Project,Turkey
GS-1275 ↗ · current registry ID: GS955
#1080of 1935 in Renewable energy#204of 295 in Turkey#769of 1801 in Gold Standard (GS)#846of 1287 in ACM0002
Audit Analysis
The Akres Wind Power Project is a Gold Standard wind energy project in Turkey with VVB-confirmed additionality and a well-known verification body, but it is undermined by a 32-CAR verification cycle, a project-specific baseline, unaddressed leakage justification, and verified emissions reductions that cover only about half the pro-rata expectation for the elapsed monitoring period. Multiple contradictions across documents and a CORSIA-eligible status introduce additional claim-safety concerns.
Red Flags
- Verified ERR of 110,256 tCO₂e covers only ~50% of the pro-rata expectation (~221,000 tCO₂e) for the 2.17-year monitoring period within the 7-year crediting period, suggesting the ex-ante estimate may be overstated
- Capacity increase from 55 MW to 62 MW (26/07/2024) was excluded from emission reduction calculations per the verification report
- 32 Corrective Action Requests were issued and closed in a single verification cycle, including missing data, incorrect electricity generation values, and calculation errors
- Leakage justification is 'not addressed' in the most recent verification report (Dec 2025), contradicting the earlier 'deemed negligible' statement
- CORSIA-eligible status creates dual-channel crediting risk; CCP status is not stated in available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 34,453 | 33,764 | 689 | |
| 2012 | 40,061 | 35,097 | 4,964 | |
| 2021 | 22,897 | 22,877 | 20 | |
| 2022 | 87,359 | 57,624 | 29,735 | |
| Total | 184,770 | 149,362 | 35,408 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, not addressed in latest doc
Project-specific baseline
FPIC contradiction, no local women in LSC
CORSIA-eligible, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →