Aliaga Wind Farm
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test, which is stronger than an unverified self-claim.
missing Leakage is not well supported: the latest verification record says it was not addressed, despite an earlier document describing it as negligible; reversal treatment is also inconsistent across documents.
Transparency
verified The project has a named verifier, Bureau Veritas (India) Pvt. Ltd., and a recent verification report dated 2026-02-17.
missing Claimed versus verified emission totals are not stated in the extracted record, and the low extraction-confidence flag means at least one key document was hard to read.
Claim Safety
verified The baseline was reassessed in 2024, which is better than an outdated baseline with no refresh.
missing Leakage and reversal inconsistencies, plus CORSIA eligibility being true, increase the risk of over-claiming and dual-market claim exposure.
Documentation
verified The record draws on many documents, with 28 documents used and a verification report that lists closed corrective actions.
missing The extraction confidence is low, and the evidence set does not clearly state several key MRV items such as verified issuance totals, usage monitoring, or buffer pool coverage.
Detailed Analysis
Integrity
The verification report confirms additionality through an investment test and says the baseline was last reassessed in 2024, which supports methodological credibility. On the downside, leakage is not addressed in the latest verification record even though an earlier document described it as negligible, and reversal handling is inconsistent across the record. The report also notes many corrective actions and clarifications, although they were closed before issuance.
Transparency
The project has a named VVB, Bureau Veritas (India) Pvt. Ltd., and a recent verification report dated 2026-02-17, which helps transparency. But the extracted record does not state claimed or verified issuance totals, and key monitoring details such as usage monitoring method are not found. The low extraction-confidence flag further reduces confidence that the documentation is fully legible and complete.
Claim Safety
Claim safety is weakened by inconsistent treatment of leakage and reversal risk, both of which matter for over-crediting risk. The project is CORSIA-eligible, which does not by itself imply a problem, but it does mean the claim environment is more sensitive. The baseline was reassessed in 2024, which is positive, yet the unresolved contradictions keep the score below a strong level.
Documentation
Documentation breadth is decent, with 28 documents used and a verification report that records closed corrective actions. However, the extraction confidence is low, which indicates at least one key source was difficult to read. Several important items are missing from the extracted record, including verified issuance totals, usage monitoring details, and buffer pool coverage.
Overall
I privileged the latest verification report dated 2026-02-17 for leakage and reversal treatment, because it is the most recent and project-specific source, but I discounted confidence because earlier documents conflict with it on both points. I also privileged the latest crediting-period information over the older period listed in the contradictions, again because it is more recent, but the existence of that contradiction still lowers reliability. The project is credible enough to avoid a very low score, yet the combination of low extraction confidence, many corrective actions, and unresolved document conflicts keeps the overall assessment moderate.
Audit Analysis
This wind project has some strengths: the VVB confirmed additionality, the baseline was reassessed in 2024, and the verification report says no extreme-event reversal was found. However, several reliability issues weaken confidence, including a low extraction-confidence flag, many corrective actions during verification, and contradictions on leakage, reversal events, and the crediting period. Overall, the project looks plausible but not especially robust from a claims-quality perspective.
Project Description
Developer: Bilgin Güc Santralleri Enerji Üretim A.S Type: Wind Size: Large Scale Crediting period: 2010-04-09 → 2031-04-08 Estimated annual credits: 187114 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth
Red Flags
- The verification report issued many corrective actions and clarifications, which suggests documentation and implementation issues even though they were closed before issuance.
- There are contradictions across documents on leakage treatment, reversal history, and the crediting period, reducing confidence in the record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 100,887 | 100,887 | 0 | |
| 2011 | 197,164 | 197,141 | 23 | |
| 2012 | 173,022 | 144,786 | 28,236 | |
| 2022 | 109,119 | 0 | 109,119 | |
| 2023 | 159,514 | 0 | 159,514 | |
| 2024 | 45,500 | 0 | 45,500 | |
| Total | 785,206 | 442,814 | 342,392 |
Cosa migliorerebbe questo punteggio
- Publish a clear reconciliation of the conflicting leakage, reversal, and crediting-period statements across the project documents.
- Provide a complete public MRV package with verified issuance totals, usage monitoring details, and any buffer or permanence safeguards clearly stated.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversal event in latest report, but earlier inconsistenc
0% deduction with conflicting justification
Project baseline, reassessed in 2024
FPIC and grievance mechanism documented
CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- (1)Monitoring Report_2nd monitoring period_01-01-12 to 30-06-12_v1.0.pdf
- GS388_Aliağa WPP-Project-Annual-Report-Form_2022.pdf
- (1)Monitoring Report_3rd monitoring period_01-07-12 to 30-12-12_v2.0.pdf
- Final_Ver Report_1129 Aliağa Wind_Khalid Mahmood_v03-06-09-2024_cc.pdf
- (1)Monitoring Report_1st monitoring period_09-04-10 to 31-12-11_v4.0.pdf
- ER Calculations_Aliaga WFP_v04.xlsx
- +9 more
Other
pdd
validation
- (1)Verification Report_3rd monitoring period_01-07-12 to 30-12-12_v1.0.pdf
- (1)Verification Report_2nd monitoring period_01-01-12 to 30-06-12_v2.0.pdf
- Verification Report_v04_GS 735 Aliaga Wind (6th MP)_Öykü Yakupoğlu_17-02-2026_clean.pdf
- GS.VAL.23.75_FVR_V3.1_Clean.pdf
- Validation_report_rev05_02 02 2012.pdf
- (1)Verification Report_1st monitoring period_09-04-10 to 31-12-11_v2.0.pdf
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →