Alkumru Hydroelectric Power Plant

VCS-1464 ↗

#595of 1935 in Renewable energy#15of 26 in Türkiye#330of 1339 in Verra (VCS)#457of 1287 in ACM0002

5.6/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.5
Documentation
4.5

Audit Analysis

The Alkumru hydroelectric project is a well-established VCS avoidance project (ACM0002) with a sound regulatory additionality test confirmed by the VVB and a jurisdictional baseline reassessed in 2022. However, the verification report lists an extensive set of material findings—including calculation inconsistencies, missing monitoring parameters, and transcription errors—that undermine confidence in the reported figures. The project over-delivered relative to its pro-rata expectation for the 2020–2021 monitoring period, but documentation quality and safeguard gaps (notably the absence of FPIC) limit overall assurance.

Red Flags

  • The 2023 verification report lists at least 17 material findings, including inconsistencies in ER spreadsheet calculations, manual insertion of values, missing EGPP-Import/Export data, and lack of clarity on the emission factor used—raising concerns about the reliability of the 309,207 tCO₂e figure.
  • No site visit was conducted for the verification; the audit relied entirely on remote review and interviews due to the COVID-19 lockdown, limiting the VVB's ability to independently confirm metering and operational data.
  • Free, Prior and Informed Consent (FPIC) was not conducted, despite the project's operation in Türkiye and the presence of local stakeholders; only a grievance mechanism and benefit-sharing description are documented.

Credit Vintages

IssuedRetiredAvailable
2011
358,374358,3740
2012
370,983370,9830
2013
460,597460,5970
2014
273,633273,6330
2015
391,738391,7380
2016
503,458503,4580
2017
388,799388,7990
2018
353,982170,146183,836
2019
548,57186,000462,571
2020
377,199274,465102,734
Total4,027,3343,278,193749,141

Risk Indicators

Additionality

Regulatory test, VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, deemed negligible (hydro)

Baseline

Jurisdictional, reassessed 2022

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents