Alsea River Forest Carbon Project
#35of 99 in REDD+#146of 345 in United States#64of 147 in American Carbon Registry (ACR)
Audit Analysis
The Alsea River Forest Carbon Project is a US-based improved forest management project under ACR with a verified additionality test, a 16% buffer pool, and a strong 30% quantified leakage deduction. However, significant data contradictions between the PDD and validation/monitoring reports—particularly a tenfold discrepancy in the buffer pool percentage and a 19% gap in claimed ERR—combined with material findings that include ERR calculation errors, raise meaningful concerns about the reliability of the verified figures. The project delivered roughly 800% of its pro-rata ex-ante expectation in just 22 months, a ratio that, while not impossible for a forest project in its early years, warrants scrutiny given the documented calculation corrections.
Red Flags
- Buffer pool percentage contradicts between the monitoring report (16%) and the PDD (1.6%)—a tenfold difference that, if the lower figure were correct, would leave the project with minimal permanence protection
- Verified ERR of 40,949 tCO2e represents approximately 73% of the 56,096 tCO2e lifetime ex-ante estimate after only ~22 months of monitoring, and the material findings explicitly note that vintage ERR calculation errors were found and corrected in the ACR worksheet
- Claimed ERR differs by 19% between the PDD (34,396) and the validation report (40,949), indicating the figure was revised upward during verification
- FPIC is reported as not conducted in the validation report (the more recent and authoritative document), contradicting the PDD's claim that it was performed
- No grievance mechanism is documented, and benefit sharing is not described in the validation report despite being claimed in the PDD
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 122 | 0 | 122 | |
| 2023 | 22,242 | 0 | 22,242 | |
| 2024 | 18,585 | 0 | 18,585 | |
| Total | 40,949 | 0 | 40,949 |
Risk Indicators
VVB-confirmed combined test
16% buffer pool, no reversals
30% quantified deduction
Project-specific, reassessment timing not stated
FPIC not confirmed, no grievance mechanism
CCP eligible, CORSIA not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →