Alto Benedito Novo Small Hydroelectric Project
#1214of 1935 in Renewable energy#105of 211 in Brazil#930of 1459 in CDM (UNFCCC)#395of 806 in AMS-I.D
Audit Analysis
A small-scale hydroelectric CDM project (AMS-I.D) with a confirmed barrier-test additionality assessment and a jurisdictional baseline, but the available record is limited to a 2007 validation report with no monitoring or verification data. Three corrective action requests from the validator flag procedural documentation gaps, and the absence of any verified emissions figure means the 134,464 tCO₂e lifetime claim cannot be independently corroborated.
Red Flags
- Three Corrective Action Requests (CARs) in the validation report flag missing Annex I approval letter, a crediting-period start-date inconsistency, and missing PDD section A.4 content — procedural gaps that undermine confidence in the project's administrative completeness.
- No monitoring report or verified emissions figure is available in the extracted record, so the 134,464 tCO₂e lifetime claim rests solely on the ex-ante PDD estimate with no post-implementation verification.
- Low extraction confidence across the document set indicates at least one key source was poorly readable, reducing reliability of the structured data.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed barrier test
Hydro generation – no reversal risk
Negligible – no feedstock or storage
Jurisdictional grid EF (2004)
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.