Alu Kerqin Qi Balaqirude Wind Farm 45MW Wind Power Project
#1001of 1935 in Renewable energy#547of 1084 in China#724of 1459 in CDM (UNFCCC)#788of 1287 in ACM0002
Audit Analysis
A 45 MW onshore wind project in Inner Mongolia, China, registered under CDM with a standardised jurisdictional baseline (grid EF 0.9139, 2019) and a 7-year crediting period. The project is methodologically sound for its type, but the extracted record lacks explicit additionality documentation, and a significant discrepancy in the claimed ERR between the PDD and the validation report introduces data-reliability concerns.
Red Flags
- Additionality test type and VVB confirmation are not found in the extracted record, leaving a core CDM requirement undocumented in the available evidence
- Total ERR claimed differs by a factor of ~7 between the PDD (634,606 tCO₂e) and the validation report (90,658 tCO₂e), creating ambiguity about the true crediting basis
- FPIC and grievance mechanism are not documented in the available records despite safeguards being mentioned
- One of the four source documents is of unknown type, reducing confidence in the completeness of the evidence base
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 130,817 | 0 | 130,817 | |
| Total | 130,817 | 0 | 130,817 |
Risk Indicators
Test not explicitly documented in extracted record
Wind project — no reversal risk identified
0% deemed negligible — appropriate for grid-connected wind
Jurisdictional grid EF 0.9139 (2019), reassessed 2019
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated — dual-channel risk unconfi
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →