The ÇAMINBAŞI WPP is a Gold Standard wind project in Turkey with a VVB-confirmed investment additionality test and a standard project-specific grid baseline. The 2023 monitoring period delivered 83,177 tCO₂e, roughly 124% of the pro-rata lifetime expectation, indicating no over-crediting. However, the verification report flagged nine corrective actions (including substantive additions to the additionality analysis) and multiple cross-document contradictions, tempering confidence in the documentation record.
Red Flags
- CAR 04 in the verification report required corrections to the additionality analysis, investment decision date, sensitivity analysis parameters, and common practice calculation, indicating the initial additionality case was not fully robust at submission.
- The PDD (June 2023) recorded additionality as not verified, while the verification report (December 2023) confirmed it — a material inconsistency between the project's own design document and the VVB's assessment.
- Twenty-eight corrective actions were listed in the verification report, spanning turbine commissioning dates, installed capacity, meter details, and crediting-period dates, suggesting the project documentation was not internally consistent at the time of verification.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 42,294 | 0 | 42,294 | |
| 2022 | 40,350 | 0 | 40,350 | |
| 2023 | 533 | 0 | 533 | |
| Total | 83,177 | 0 | 83,177 |
Risk Indicators
VVB-confirmed but required CAR corrections
Technology-based wind; no reversal risk
0% with quantified justification
Project-specific; standard for wind but PDD inconsistency
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →