Anew - 100-Mile Wilderness Forestry Project
#22of 99 in REDD+#102of 345 in United States#41of 147 in American Carbon Registry (ACR)
Audit Analysis
The 100-Mile Wilderness IFM project in Maine demonstrates solid structural safeguards including a VVB-verified combined additionality test, a 40% quantified leakage deduction, and an 18% buffer pool. However, eight material findings—including a 0.15-acre overlap with a CARB-registered project, incorrect site-index equations, and shelterwood harvest triggers not implemented as described—raise meaningful concerns about baseline accuracy and operational compliance. The project over-delivered relative to its pro-rata expectation, but the project-specific modeled baseline and absence of FPIC limit confidence in the integrity of the claims.
Red Flags
- 0.15 acres of project area overlap with CARB IFM project CAFR5304, creating a potential double-counting risk that required a corrective action to remove the overlap from boundary and RMZ files
- Eight material findings in the verification report, including use of incorrect Lake States site-index curves instead of Northern Maine curves, shelterwood harvest triggers not always implemented as described in the GHG Plan, and discrepancies in acre values and decay-class definitions
- Free, Prior, and Informed Consent (FPIC) was not conducted, and no grievance mechanism is documented in the available records
- Reversal events are explicitly noted as 'not addressed' in the verification report, despite the 40-year permanence claim
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 30,508 | 18,323 | 12,185 | |
| 2021 | 51,430 | 29,669 | 21,761 | |
| 2022 | 21,165 | 13,726 | 7,439 | |
| Total | 103,103 | 61,718 | 41,385 |
Risk Indicators
Combined test, VVB-verified
Buffer pool present; reversal events not addressed
40% quantified deduction
Project-specific, modeled, no reassessment date
Safeguards mentioned; FPIC not conducted, no grievance mechanism
CORSIA/CCP status not stated; CARB overlap noted
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →