Anew - Allagash Headwaters Forestry Project
#29of 99 in REDD+#127of 345 in United States#53of 147 in American Carbon Registry (ACR)
Audit Analysis
The Allagash Headwaters IFM project has the correct structural safeguards in place — VVB-verified additionality, an 18% buffer pool, a conservative 40% leakage deduction, and no reported reversals — but the verification report surfaces 24 material findings including boundary overlap with an adjacent project, multiple baseline calculation errors, and a within-document contradiction in the verified ERR figure. These data-quality issues significantly undermine confidence in the reported credit quantity despite the project's sound design.
Red Flags
- 24 material findings in the verification report (2025-01-27), including boundary shapefiles overlapping with an adjacent project (CAR 1), strata area mismatches, and multiple baseline calculation errors (CR 1–CR 14)
- Within-document contradiction: the same verification report (2025-01-27) contains two different verified ERR values — 112,206 and 92,008 tCO₂e — with no explanation of which is final
- FPIC was not conducted and no grievance mechanism is documented, despite safeguards being mentioned in the project documents
- Baseline is project-specific and modeled, with no record of reassessment; the verification report flags a negative NPV in the financial barriers test and an NPV mismatch between workbooks (CR 5, CR 10)
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 24,609 | 8,087 | 16,522 | |
| 2021 | 56,848 | 14,954 | 41,894 | |
| 2022 | 55,749 | 1,847 | 53,902 | |
| 2023 | 56,479 | 0 | 56,479 | |
| 2024 | 4,183 | 947 | 3,236 | |
| Total | 197,868 | 25,835 | 172,033 |
Risk Indicators
Combined test, VVB-verified
18% buffer pool, no reversals
40% quantified deduction
Project-specific, modeled, no reassessment on record
Mentioned but no FPIC or grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →