Anew - Bluestone Forestry Project
#21of 99 in REDD+#94of 345 in United States#39of 147 in American Carbon Registry (ACR)
Audit Analysis
The Anew-Bluestone Forestry Project is an ACR-registered improved forest management project in West Virginia with a verified combined additionality test, an 18% buffer pool, and a 40% quantified leakage deduction. However, the project-specific modeled baseline, absence of FPIC and a grievance mechanism, ten material findings requiring correction, and limited safeguards documentation temper an otherwise structurally sound design. The project over-delivered relative to its pro-rata ex-ante expectation for the monitoring period, supporting claim credibility.
Red Flags
- Ten material findings were identified in the validation report (Nov 2024), including overlap with other carbon projects (Finite Carbon, Anew Cumberland), species FIA code misallocation, and a pulpwood calculation error — all corrected but indicating data-quality fragility.
- Free, Prior, and Informed Consent (FPIC) was not conducted and no grievance mechanism is documented, despite the project affecting forestland in West Virginia.
- The baseline is project-specific and modeled rather than measured, and the date of last baseline reassessment is not stated in any available document.
- Five corrective actions were required by the VVB, including removal of overlapping project areas and correction of HWP species allocations, suggesting the initial PDD contained material errors.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 4,989 | 0 | 4,989 | |
| 2021 | 121,415 | 0 | 121,415 | |
| 2022 | 121,415 | 0 | 121,415 | |
| Total | 247,819 | 0 | 247,819 |
Risk Indicators
VVB-confirmed combined test
18% buffer pool, no reversals
40% quantified deduction
Project-specific, modeled, reassessment date unstated
Mentioned but no FPIC or grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →