Anshan Iron and Steel Group Corporation (Anshan) Blast Furnace Gas Combined Cycle Power Plant Project

CDM-1609 ↗

#182of 204 in China#194of 213 in CDM (UNFCCC)#17of 17 in ACM0004

4.0/ 10
Integrity
3.5
Transparency
4.0
Claim Safety
4.0
Documentation
5.0

Audit Analysis

This CDM blast-furnace-gas combined-cycle power plant project in China has a verified investment-test additionality and a reasonable zero-leakage position for an energy-efficiency project, but is severely undermined by eight material findings, fifteen required corrective actions, and a CDM-EB rejection of CER issuance for a prior period. Multiple inconsistencies between the PDD, validation report, and monitoring report — including conflicting baseline methods, crediting-period dates, and leakage justifications — erode confidence in the underlying data. The project's claim safety is further weakened by the absence of verified ERR figures for the monitoring period and a grid emission factor drawn from 2004 data.

Red Flags

  • CDM-EB rejected the request for issuance of CERs for the period 1 March 2010 to 30 September 2010, indicating a material compliance failure during the crediting period
  • Eight material findings identified in the verification process, including missing monitoring of auxiliary fuel volume, metering arrangements differing from the registered PDD, and missing discussion of existing coal-fired captive power plants as baseline alternatives
  • Fifteen corrective actions were required, spanning monitoring gaps, calculation errors, technical description mismatches, and baseline-section omissions
  • Grid emission factor of 1.0027 tCO₂/MWh is drawn from 2004 data, raising questions about its continued representativeness for the 2010–2011 monitoring period
  • Total verified ERR for the monitoring period is not stated in the extracted record, preventing independent verification of delivery against the pro-rata expectation

Credit Vintages

IssuedRetiredAvailable
2010
1,895,07301,895,073
Total1,895,07301,895,073

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

EE project, no buffer pool recorded

Leakage

0% deduction, justification contradictory across docs

Baseline

Method contradictory; grid EF from 2004

Safeguards

Safeguards and benefit sharing mentioned; no FPIC or grievan

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0004

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents