ARISU SOLAR POWER PLANT
GS-2619 ↗ · current registry ID: GS7775
#1213of 1935 in Renewable energy#229of 295 in Turkey#999of 1801 in Gold Standard (GS)#942of 1287 in ACM0002
Audit Analysis
The Arisu Solar Power Plant is a Gold Standard solar thermal electricity project in Turkey with a VVB-confirmed combined additionality test and a reasonable leakage treatment, but it is undermined by eight unresolved corrective actions, ten cross-document contradictions, and a roughly three-fold gap between the PDD's ex-ante estimate and the verified ERR. The project-specific baseline, absence of a buffer pool, and unaddressed permanence discussion further weaken the integrity profile.
Red Flags
- Eight corrective actions (CAR#01–CAR#08) were raised in the verification report (2025-06-04) and remain open, indicating material compliance deficiencies during the monitoring period.
- The PDD (2021) estimated 49,030 tCO₂e while the monitoring report (2024) and verification report (2025) both report 145,705 tCO₂e — a ~3× increase that is only partially explained by the grid emission factor rising from 0.545 to 0.6488 (+19%).
- Ten fields show contradictions between the PDD, validation report, monitoring report, and verification report, including baseline method (project vs jurisdictional), CORSIA eligibility (true vs false), and crediting period dates.
- Permanence / reversal risk is marked as 'not addressed' in the verification report, even though the monitoring report (2025-12-29) states no reversal events were reported.
- Benefit-sharing arrangements are described in the monitoring report but explicitly absent from the verification report, creating uncertainty about Gold Standard co-benefit compliance.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 47,663 | 0 | 47,663 | |
| 2023 | 73,039 | 0 | 73,039 | |
| 2024 | 25,003 | 0 | 25,003 | |
| Total | 145,705 | 0 | 145,705 |
Risk Indicators
VVB-confirmed combined test
Not explicitly addressed in verification report
0% deemed negligible – reasonable for solar
Project-specific; reassessment date not stated
FPIC and grievance present; benefit-sharing inconsistent
Not CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →