Associated Gas Recovery and Utilization at Block 9
Audit Analysis
A CDM fugitive-emissions avoidance project in Oman (associated gas recovery at Block 9) with VVB-confirmed additionality and a resolved set of corrective actions, but undermined by a significant internal contradiction in claimed emission reductions, a weak 'deemed negligible' leakage justification for a gas-handling project, and a project-specific baseline. The project is an avoidance-type activity with lower inherent permanence risk, yet several transparency and claim-safety gaps prevent a higher rating.
Red Flags
- Two different total ERR figures (446,022 and 1,719,991 tCO₂e) appear in the same monitoring report dated 2022-12-07, with no clear period attribution, creating material uncertainty about the actual credit volume
- Leakage is set at 0% with only a 'deemed negligible' justification in the monitoring report, while an appendix document references a 'quantified' treatment — an inconsistency that weakens confidence in the leakage assessment for a gas-recovery project
- FPIC was not conducted and no grievance mechanism is documented, despite safeguards being mentioned in the project documents
- Crediting period differs between the PDD (2013-01-01 to 2019-12-31) and the monitoring report (2013-12-31 to 2020-12-30), raising questions about the exact registration and validity window
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 212,267 | 0 | 212,267 | |
| 2020 | 344,294 | 0 | 344,294 | |
| 4528 | 446,022 | 0 | 446,022 | |
| Total | 1,002,583 | 0 | 1,002,583 |
Risk Indicators
VVB-confirmed combined test, all CARs resolved
Avoidance project, no reversal risk inherent
0% deduction, 'deemed negligible' is thin for gas recovery
Project-specific; measured vs modelled inconsistency
Safeguards mentioned but no FPIC or grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →