Skip to main content
CDMMethane avoidanceMalaysiaAMS-III.F

Avoidance of methane production in POME treatment through Boustead Biotherm Palmass Technology

CDM-1795 ↗

#53of 203 in Industrial#64of 213 in CDM (UNFCCC)#7of 13 in AMS-III.F

5.4/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A CDM methane-avoidance project in Malaysia using composting of palm oil mill effluent, with a VVB-verified investment additionality test and a standardized methodology (AMS-III.F). The project significantly under-delivered relative to its ex-ante estimate (approximately 36% of the pro-rata expectation for the elapsed monitoring period), which reduces over-crediting risk but raises questions about baseline accuracy. Key concerns include a 0% leakage deduction with contradictory justifications across documents, a project-specific modeled baseline, and multiple material findings including monitoring deviations and design changes.

Red Flags

  • Leakage justification is contradictory: the validation report (2008) states leakage was 'deemed negligible' while the monitoring report (2012) characterizes it as 'quantified,' yet the deduction in both cases is 0% — the basis for the zero deduction is unclear.
  • The monitoring report records a temporary deviation where COD samples were not sent for external analysis and internal analysis was not carried out for specific periods, undermining the reliability of the verified emissions figures.
  • The project design changed mid-crediting-period (composting duration altered from 7 to 4 days then back to 8 days; drying process ceased after May 2009), yet the baseline and methodology were not formally reassessed in the available documents.
  • Two corrective actions remain outstanding (QA/QC procedure for COD samples and revised monitoring frequency for oxygen/temperature), indicating the monitoring plan was not fully compliant at the time of the report.

Credit Vintages

IssuedRetiredAvailable
2013
18,637018,637
Total18,637018,637

Risk Indicators

Additionality

VVB-verified investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, modeled, no reassessment data

Safeguards

Mentioned and benefit sharing described, but FPIC and grieva

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-III.F

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents