AWMS Methane Recovery Project BR06-S-30, Mato Grosso and Mato Grosso do Sul, Brazil
#64of 104 in Brazil#162of 213 in CDM (UNFCCC)#36of 62 in AMS-III.D
Audit Analysis
A CDM methane-recovery project in Brazil with VVB-confirmed additionality but significant data gaps in verified emissions, leakage treatment, and permanence safeguards. Five material findings during validation (including incorrect population data and unclear project boundaries) and contradictory leakage treatment between the validation and monitoring reports reduce confidence in the credit's integrity. The project is closed (crediting period ended March 2015), but the absence of a verified ERR figure for the monitoring period limits the ability to confirm actual delivery.
Red Flags
- Leakage treatment is contradictory: the validation report (2007) deems leakage negligible, but the monitoring report (2011) records it as not addressed, with no quantified deduction in either document
- Five material findings in the validation report, including incorrect population and farm growth rates in the first PDD, unclear project boundaries, and methodology changes during validation
- No verified ERR figure is available for the monitoring period (2008–2011), making it impossible to confirm actual credit delivery against the 11,834 tCO₂e lifetime estimate
- No buffer pool, permanence mechanism, or reversal-event tracking is documented for a methane-avoidance project where biodigestor failure would release captured gas
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 11,479 | 0 | 11,479 | |
| Total | 11,479 | 0 | 11,479 |
Risk Indicators
VVB-confirmed combined test
No buffer pool or reversal tracking documented
Contradictory: negligible vs not addressed
Project-specific, modeled, no reassessment data
Mentioned but FPIC and grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →