AWMS Methane Recovery Project MX06-S-91, Nuevo Leon, México
#20of 27 in Mexico#182of 213 in CDM (UNFCCC)#49of 62 in AMS-III.D
Audit Analysis
This CDM methane avoidance project (2007–2014) has a VVB-confirmed barrier additionality test and a well-known verification body (TÜV SÜD), but suffers from significant evidence gaps: no monitoring data, no verified emission reductions, no buffer pool, and leakage was never addressed. Five material findings during validation indicate initial documentation weaknesses, and the project-specific modeled baseline limits confidence in the 84,031 tCO₂e lifetime claim.
Red Flags
- Leakage was explicitly not addressed in a methane avoidance project where fugitive emissions and displaced-waste pathways are expected
- No buffer pool or permanence mechanism documented for a project whose crediting period has already expired (2014)
- No monitoring reports or verified emission reduction figures available in the extracted record
- Five material findings (corrective action requests) were raised during validation, including missing biodigester design and outdated emission factors
- Baseline is project-specific and modeled rather than jurisdictional, with no reassessment data available
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed barrier test
No buffer pool; no reversal data
Not addressed in methane project
Project-specific, modeled; no reassessment data
Mentioned but no FPIC or grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →