Baños V Hydroelectric Power Plant (BVHPPP)
#1216of 1935 in Renewable energy#12of 24 in Peru#934of 1459 in CDM (UNFCCC)#396of 806 in AMS-I.D
Audit Analysis
The Baños V Hydroelectric Power Plant is a CDM-registered hydro project in Peru with VVB-confirmed additionality via an investment test, but the project-specific baseline carries a documented contradiction with the PDD, and a 15% discrepancy in the grid emission factor between the validation report and an appendix raises data-reliability concerns. Multiple material findings at validation required corrections to the PDD, and the low extraction confidence across seven source documents limits the depth of verification possible. For a renewable-generation project, inherent permanence and leakage risks are minimal, but the baseline and additionality evidence are weaker than ideal.
Red Flags
- Grid emission factor discrepancy of ~15% between the validation report (0.61291) and a 2010 appendix (0.7035), with no reconciliation documented
- Baseline method contradiction: validation report states 'project' while the PDD states 'jurisdictional', leaving the actual baseline approach ambiguous
- Additionality rests solely on an investment test after technological and prevailing-practice barriers were eliminated from the analysis
- Seven material findings at validation, including a missing Letter of Approval and errors in the IRR spreadsheet, indicate the PDD required substantial correction before approval
- No verified ERR figure was found in any available document, preventing cross-checking of the 355,899 tCO₂e lifetime claim
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test only; barriers eliminated
Renewable generation; no reversal risk
0% deemed negligible; consistent with hydro
Project-specific; method contradicted in PDD
FPIC done; grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →