Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Kazakhstan Registry: RegisteredACM0002

Badamsha Wind Farm in Kazakhstan

VCS-1954 ↗

#418of 1935 in Renewable energy#210of 1339 in Verra (VCS)#312of 1287 in ACM0002

5.9/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
5.0

Audit Analysis

The Badamsha Wind Farm is a straightforward renewable-energy project under VCS ACM0002 with VVB-verified additionality, no material findings, and no reversal events. However, six contradictions across the project documents — particularly on baseline method and leakage treatment — and the absence of CORSIA/CCP status create meaningful uncertainty about data reliability and dual-channel risk. The project is fundamentally sound but its documentation record is inconsistent enough to warrant caution.

Red Flags

  • Baseline method is described as 'project-specific' in the 2021 verification report but 'jurisdictional' in the 2024 monitoring report — a direct contradiction that undermines confidence in the baseline characterization.
  • Leakage justification is stated as 'quantified' in the 2021 verification report but 'not addressed' in the 2024 verification report, despite a 0% deduction in both cases.
  • CORSIA eligibility and CCP status are both not stated in any available document, leaving dual-channel risk unassessed.
  • Grid emission factor of 0.8703 tCO₂/MWh is drawn from 2016 data, which is nearly a decade old at the time of the 2024 verification.

Credit Vintages

IssuedRetiredAvailable
2020
95,21542,30552,910
2021
161,1340161,134
2022
82,821082,821
Total339,17042,305296,865

Risk Indicators

Additionality

VVB-verified investment test

Permanence

Avoidance project, no reversals

Leakage

0% deduction, justification inconsistent

Baseline

Grid EF used but method contradicted

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents