Bagasse cogeneration project at Lam Son Sugar JSC
#15of 352 in Biomass#20of 80 in Vietnam#267of 1459 in CDM (UNFCCC)#5of 115 in AMS-I.C
Audit Analysis
A CDM bagasse cogeneration project at a Vietnamese sugar factory using the standardized AMS-I.C methodology, with VVB-confirmed investment additionality and a reasonable negligible-leakage justification. However, the project-specific baseline, a grid emission factor frozen at 2008 values, and a notable gap between claimed and verified emission reductions (roughly 75% verification rate) introduce moderate over-crediting risk. Documentation is reasonably complete with all corrective actions resolved, but several sustainability and monitoring details remain unreported.
Red Flags
- Grid emission factor of 0.5558 tCO2/MWh is anchored to 2008 data; Vietnam's grid has decarbonised since, meaning the baseline may overstate the project's marginal reduction
- Verified ERR of 23,849 tCO2e is only ~75% of the 31,577 tCO2e claimed in the 2020 monitoring report, indicating the VVB applied material downward adjustments
- No feedstock sustainability assessment, no LCA, and no carbon-content testing data found in the extracted record, leaving the bagasse supply chain unverified
- Two monitoring reports show different claimed ERR figures (27,932 in Nov 2019 vs 31,577 in Sep 2020), raising a data-consistency question
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 17,095 | 0 | 17,095 | |
| 2015 | 21,706 | 0 | 21,706 | |
| 2016 | 22,628 | 0 | 22,628 | |
| 2017 | 47,058 | 0 | 47,058 | |
| 2019 | 22,888 | 0 | 22,888 | |
| 2020 | 27,932 | 0 | 27,932 | |
| 2021 | 31,577 | 0 | 31,577 | |
| Total | 190,884 | 0 | 190,884 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversals
Negligible, justified for bagasse
Project-specific, 2008 grid EF
Mentioned but FPIC/grievance not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →