Bagepalli CDM Biogas Programme

CDM-0121 ↗

#121of 268 in Biogas#625of 975 in India#914of 1459 in CDM (UNFCCC)

4.8/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.0
Documentation
5.0

Audit Analysis

The Bagepalli CDM Biogas Programme is a methane-avoidance project under CDM methodology AMS.I.E with a combined additionality test and a quantified 5% leakage deduction. However, the evidence base is limited to the validation stage (no monitoring reports), usage monitoring relies on self-reporting, and a significant discrepancy exists between the PDD's ex-ante estimate (94,633 tCO₂e) and the validated figure (13,519 tCO₂e), raising questions about the robustness of the original baseline. The project is in its early crediting period (2020–2027) with no reversal events or outstanding corrective actions, but key permanence and safeguards details remain undocumented.

Red Flags

  • Large discrepancy in ex-ante ERR: the PDD (July 2020) states 94,633 tCO₂e while the validation report (August 2020) confirms only 13,519 tCO₂e — a roughly 7-fold difference that, although resolved in favour of the lower validated figure, indicates the original baseline was substantially overestimated before VVB review.
  • No monitoring reports are present in the evidence base; the only verified ERR figure (13,519) is identical to the validated ex-ante claim, making it impossible to confirm actual delivery against expectation.
  • Usage monitoring is based on self-reporting with no independent verification mechanism documented.
  • Buffer pool or permanence mechanism is not stated in any available document, leaving reversal risk unaddressed for a 7-year crediting period.

Credit Vintages

IssuedRetiredAvailable
2008
11,761011,761
2011
35,872035,872
2013
33,087033,087
2014
30,569030,569
2017
52,088052,088
2019
23,674023,674
2021
16,533016,533
Total203,5840203,584

Risk Indicators

Additionality

Combined test applied but VVB confirmation not explicitly st

Permanence

no reversal events but mechanism

Leakage

5% quantified deduction with justification

Baseline

Project-specific baseline; corrected during validation; reas

Safeguards

Grievance mechanism and benefit sharing present; FPIC not do

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents