Baihubao 33.75MW Wind Power Generation Project in Shanxi Province
#1082of 1935 in Renewable energy#605of 1084 in China#810of 1459 in CDM (UNFCCC)#848of 1287 in ACM0002
Audit Analysis
A 33.75 MW onshore wind project in Shanxi, China, validated under CDM methodology ACM0002 v17.0 with a jurisdictional baseline and a 7-year crediting period (2016–2023). The project is inherently low-risk on permanence and leakage, but the extracted record lacks explicit additionality test details, monitoring data, and several MRV parameters, and the validation report flagged two material findings (one requiring a corrective action on the combined margin emission factor). Overall a moderate-quality CDM wind credit with some documentation gaps.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality basis unverified from available documents.
- The validation report identified two material findings, including incorrect application of wOM and wBM weights in the PDD update, requiring a corrective action to revise the combined margin emission factor.
- No monitoring reports or monitoring period data were found in the extracted record, limiting the ability to verify actual performance against the 406,476 tCO₂e claim.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 25,245 | 0 | 25,245 | |
| 2011 | 89,333 | 0 | 89,333 | |
| 2012 | 57,937 | 0 | 57,937 | |
| Total | 172,515 | 0 | 172,515 |
Risk Indicators
Test type not stated in extracted record
Wind generation – no storage or reversal risk
0% deemed negligible – appropriate for wind
Jurisdictional, reassessed 2017
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →