Bailongjiang Dalijie Hydropower Station
#1155of 1935 in Renewable energy#668of 1084 in China#876of 1459 in CDM (UNFCCC)#902of 1287 in ACM0002
Audit Analysis
A small Chinese run-of-river hydropower project under CDM with confirmed additionality and a jurisdictional grid baseline, but undermined by a 10× discrepancy in the lifetime emission reduction figure between the PDD and the monitoring report, a turbine model that changed after registration, and 14 material findings with 23 corrective actions. The project is physically plausible but the data reliability issues create meaningful uncertainty around the magnitude of claimed reductions.
Red Flags
- 10× discrepancy in lifetime ERR: the PDD (2012) states 1,389,190 tCO₂ while the monitoring report (2016) states 138,919 tCO₂ — almost certainly a decimal error in one document, but it makes the over/under-crediting ratio ambiguous
- Turbine model changed from HL290-LJ-280 to HLA551C-LJ-272 and generator from SF13.4-36-470 to SF-J13.4-36/5100 after PDD registration, meaning the actual equipment differs from what was validated
- 14 material findings and 23 corrective actions identified during validation, including missing GPS coordinates, IRR inconsistencies, missing flow diagram, and missing meter accuracy details in the monitoring plan
- Grid emission factor dated 2005 (0.8498 tCO₂/MWh) used for a project operating 2009–2019, raising the question of whether the baseline reflects current grid conditions
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 101,454 | 0 | 101,454 | |
| 2012 | 93,921 | 0 | 93,921 | |
| 2013 | 147,295 | 0 | 147,295 | |
| 2014 | 122,631 | 0 | 122,631 | |
| 2016 | 206,336 | 0 | 206,336 | |
| Total | 671,637 | 0 | 671,637 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, reasonable for hydro
Jurisdictional grid EF from 2005, not yet reassessed
Safeguards mentioned, benefit sharing described, but FPIC an
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →