Bajo Frío Hydro Power Project
#346of 1935 in Renewable energy#1of 11 in Panama#217of 1459 in CDM (UNFCCC)#257of 1287 in ACM0002
Audit Analysis
The Bajo Frío Hydro Power Project is a small-scale hydro avoidance project in Panama with a solid additionality assessment (combined investment and common-practice test confirmed by DNV) and a jurisdictional grid baseline. However, the absence of FPIC, the lack of any monitoring reports in the available record, and low extraction confidence limit confidence in the project's ongoing compliance and data quality.
Red Flags
- FPIC was not conducted despite safeguards being mentioned in the validation report
- No monitoring reports were found in the available document set, leaving post-approval performance unverified
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable
- CORSIA eligibility and CCP status are not stated in any available document
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
Negligible, justified for hydro
Jurisdictional grid EF (2010)
Safeguards mentioned but FPIC absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →