The Balabanlı Wind Power Plant is a Gold Standard wind project with VVB-confirmed additionality (combined test) and reasonable safeguards, but it is undermined by a significant discrepancy between the PDD ex-ante estimate (112,167 tCO₂e) and the verified figure (319,116 tCO₂e), a project-specific baseline, and an extensive list of 17 corrective actions that had to be resolved during verification. The project is CORSIA-eligible with CCP status not stated, creating dual-channel risk.

Red Flags

  • The PDD ex-ante estimate of 112,167 tCO₂e is roughly one-tenth of the 319,116 tCO₂e verified for a single two-year monitoring period, implying the project delivered approximately 1,000% of the pro-rata expectation — a discrepancy that is not explained in the available documents and raises over-crediting concerns.
  • Seventeen Corrective Action Requests, 22 Clarification Requests, and 1 Forward Action Request were raised during validation, including calculation errors in emission reductions, incorrect meter calibration dates, and misaligned monitoring parameters, indicating substantial initial data-quality problems.
  • Reversal risk is explicitly 'not addressed' in the 2025 verification report, and no buffer pool percentage is stated, leaving permanence governance undocumented despite the project being an avoidance-type wind installation.
  • CORSIA eligibility is confirmed while CCP status is not stated, leaving the project exposed to potential dual-channel use without a clear single-registry commitment.

Credit Vintages

IssuedRetiredAvailable
2014
51,47751,45918
2015
90,90790,9070
2016
95,65595,6550
2017
101,87582,23719,638
2018
112,495111,787708
2019
104,746104,515231
2020
112,933112,9330
2021
113,961104,6099,352
2022
118,4340118,434
2023
117,726300117,426
Total1,020,209754,402265,807

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

Deemed negligible, reasonable for wind

Baseline

Project-specific, not jurisdictional

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA-eligible, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents