BALIKESİR LANDFILL GAS (LFG) CAPTURE AND UTILIZATION PROJECT
#137of 189 in Methane#271of 295 in Turkey#1091of 1339 in Verra (VCS)#119of 159 in ACM0001
Audit Analysis
The Balikesir LFG project is a registered VCS landfill gas capture project with VVB-confirmed additionality, but it is burdened by 24 material findings, 9 corrective actions, an unaddressed permanence risk, and a 0% leakage deduction justified only as 'deemed negligible.' The project delivered roughly 77% of its pro-rata expected reductions for the monitoring period, with only 8 of 10 gas engines operational due to lower-than-expected landfill gas generation, raising meaningful over-crediting and data-integrity concerns.
Red Flags
- 24 material findings in the verification report, including geocoordinates erroneously linked to Saudi Arabia, punched-in (non-linked) values in the ER calculation sheet, and a 2.8 MWe installed-capacity discrepancy between the PDD and the monitoring report
- Leakage deduction of 0% justified solely as 'deemed negligible' in the verification report, contradicting the validation report's 'quantified' characterization, with no quantified leakage analysis for a project involving gas transport, flaring, and incomplete capture
- Only 8 of 10 gas engines operational due to lower-than-expected LFG generation, meaning the project is underperforming relative to its design basis
- Change in project proponent from BIO SOLUTIONS to BIOTREND during the verification process, raising governance and continuity concerns
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 200,000 | 92,593 | 107,407 | |
| 2021 | 40,000 | 1,154 | 38,846 | |
| Total | 240,000 | 93,747 | 146,253 |
Risk Indicators
VVB-confirmed combined test
Not addressed
0% deduction, weak justification
Project-specific, mixed method
Grievance present; FPIC not stated
CORSIA and CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →