Balikesir Susurluk 45 MW Wind Farm Project

GS-1225 ↗

4.6 / 10
Integrity
5.4
Transparency
4.2
Claim Safety
4.6
Documentation
3.1

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the project uses an investment test under ACM0002.

missing Reversal handling is not addressed in the extracted record, and the project has a design-change related FAR tied to adding 11 turbines.

Transparency

verified The monitoring period is stated for 2023, and the VVB is identified as RINA Services S.p.A.

missing Verified versus claimed issuance totals are not found, and the usage monitoring method is not stated in available documents.

Claim Safety

verified Leakage is treated as negligible with a 0% deduction, which supports lower over-crediting risk for a wind project.

missing The project is not shown to be CORSIA-ineligible or CCP-approved, so dual-claim risk is not fully excluded.

Documentation

verified A relatively large document set was used, and the baseline was reassessed in 2025.

missing Extraction confidence is low, and several key fields are missing or only partially documented.

Detailed Analysis

Integrity

The project has some solid integrity signals: the validation report identifies an investment test and says additionality was confirmed by the VVB, and the baseline was reassessed in 2025. However, permanence is weaker because reversal events are not addressed in the extracted record, buffer pool coverage is not found, and the FAR about adding 11 turbines suggests design-change management issues that needed follow-up. Leakage is presented as negligible with a 0% deduction, but the contradiction with an earlier quantified leakage treatment lowers confidence.

Transparency

Transparency is only moderate because the monitoring period is stated and the VVB is named, but the extracted record does not provide verified issuance totals, claimed issuance totals, or a usage monitoring method. The registry and methodology are identified, yet the absence of public-facing performance details limits MRV clarity. The low extraction confidence also suggests at least one key source was difficult to read, which further weakens documentation quality.

Claim Safety

Claim safety is mixed. The project is a wind farm under a standardized methodology, leakage is treated as negligible, and the baseline is project-based, which is not unusual for this sector. Still, the record does not clearly show CORSIA ineligibility or CCP approval status, so dual-claim risk is not fully resolved, and the contradictions around leakage and the crediting period reduce confidence in the claim boundary.

Documentation

Documentation is below average because, although 23 documents were used and the project has a recent validation report, the extraction confidence is low. Several important items are missing or not stated in available documents, including buffer pool coverage, usage monitoring, and verified issuance totals. The presence of multiple closed CARs and CRs shows active review, but it also indicates the project required substantial corrective work before issuance.

Overall

The project appears viable but not especially high-confidence from a credit-quality perspective. I privileged the most recent validation report dated 2025-08-12 for the investment-test framing, the negligible leakage treatment, and the 2025 baseline reassessment, because it is the latest and most specific source; however, I downgraded confidence because the contradictions show earlier documents reported a combined additionality test, quantified leakage, none-reported reversals, and an earlier crediting period. The grid emission factor contradiction is especially notable because the record shows both 0.607 and 606.942..., which likely reflects unit or extraction inconsistency rather than a true methodological change, but it still weakens reliability. Under the stated gate rules, the documentation score is above 3.0 so no transparency cap is triggered, and integrity is above 4.0 so the overall cap does not apply.

Audit Analysis

This is a real, registered wind project with VVB-confirmed additionality and a recent baseline reassessment, but the record has meaningful reliability gaps and several unresolved contradictions. Leakage is treated as negligible, yet permanence and monitoring transparency are weaker because reversal handling, usage monitoring, and key registry fields are not clearly documented.

Project Description

Developer: Eksim Enerji Anonim Sirketi Type: Wind Size: Large Scale Crediting period: 2011-02-13 → 2032-02-12 Estimated annual credits: 75577 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth

Red Flags

  • The record contains contradictions on additionality test type, leakage treatment, reversal status, crediting period, and grid emission factor, which reduces confidence in the extracted facts.
  • No buffer pool percentage, usage monitoring method, or verified issuance totals were found, limiting confidence in permanence and transparency.

Credit Vintages

Issued Retired Available
2011
69,636 44,636 25,000
2012
88,053 88,053 0
2013
32,166 31,941 225
2016
21,995 21,995 0
2017
78,584 55,484 23,100
2018
10,403 10,355 48
2021
30,928 3,219 27,709
2022
93,511 0 93,511
2023
22,092 0 22,092
Total 447,368 255,683 191,685

Cosa migliorerebbe questo punteggio

  • Provide a clean, reconciled issuance and monitoring package showing verified versus claimed ERs, usage monitoring, and the exact leakage and reversal treatment used in the latest issuance decision.
  • Publish a document crosswalk that resolves the contradictions on additionality test type, crediting period, leakage, reversal status, and grid emission factor, with clear source precedence.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

buffer pool and reversal handling unclear

Leakage

0% deduction but contradictory treatment

Baseline

project baseline with reassessment timing only partly clear

Safeguards

FPIC, grievance mechanism, and safeguards documented

Double-claim

CORSIA/CCP status not fully stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti