Balkrishna Industries Limited
#598of 1935 in Renewable energy#293of 975 in India#333of 1339 in Verra (VCS)#207of 806 in AMS-I.D
Audit Analysis
A 5 MW captive wind project in Rajasthan with a standard jurisdictional baseline and VVB-confirmed additionality, but hampered by numerous material findings related to meter calibration, data inconsistencies, and missing documentation. The verified ERR matches the claimed figure exactly, and no reversal events have occurred, but the low extraction confidence and open corrective actions reduce confidence in the overall data quality.
Red Flags
- 18 material findings reported in the verification report, including missing calibration reports for 2008-09, inconsistencies in energy meter numbers, and discrepancies in JMR/invoice data across multiple months (Sep 2011, Dec 2012/2013, Jan 2013, Jun/Nov 2014, Sep 2013)
- Two corrective actions remain open: Appendix 1 missing from the Monitoring Report and the GHG emissions baseline table in section 4.1 incomplete
- Minimum extraction confidence rated low, indicating at least one key document was poorly readable or incomplete
- FPIC not conducted despite safeguards being mentioned and a grievance mechanism being in place
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2006 | 24,911 | 222 | 24,689 | |
| Total | 24,911 | 222 | 24,689 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversals
Negligible, captive use justified
Jurisdictional, 2008 grid EF, no reassessment date
Grievance mechanism present, FPIC not conducted
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →