Bandirma-3 WPP

GS-1146 ↗ · current registry ID: GS683

#133of 295 in Turkey#346of 1801 in Gold Standard (GS)#505of 1287 in ACM0002

5.5/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.0
Documentation
4.5

Audit Analysis

Bandirma-3 WPP is a Gold Standard wind project with a solid jurisdictional baseline and VVB-confirmed additionality, but its integrity is undermined by an extensive list of data-quality errors, an unapproved capacity increase included in credit calculations, and two unresolved findings (grievance mechanism implementation and agricultural land concerns). The project over-delivered relative to its pro-rata expectation in the 2023 monitoring period, reducing over-crediting risk, yet the sheer volume of corrective actions across multiple verification cycles signals systemic MRV weaknesses.

Red Flags

  • Net electricity generation calculation included a capacity increase (turbine #10 limit removal, +25 MW) that was not approved for the crediting period, raising over-crediting risk in affected periods
  • Two findings remain open: effective implementation of the grievance mechanism (FAR 1) and verification of agricultural land impairment concerns raised by Carikkoy villagers (FAR 2)
  • Internal consumption data was incorrect for the entire monitoring period and figures were hidden in the Excel sheet, preventing independent cross-check
  • FPIC was not conducted despite the project's proximity to local communities (Carikkoy Village)
  • Realized emission reductions in an earlier period were significantly lower than estimates due to insufficient wind power, indicating baseline generation assumptions may be optimistic

Credit Vintages

IssuedRetiredAvailable
2010
28,69528,6950
2011
46,07046,0700
2012
41,37441,3740
2013
37,49537,301194
2014
31,94131,303638
2015
40,38732,7747,613
2016
42,92842,070858
2017
8,9668,9660
2018
19,27519,2750
2019
69,06422,24746,817
2020
77,11132,07045,041
2021
71,262071,262
2022
53,089053,089
Total567,657342,145225,512

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversals

Leakage

0% justified for grid displacement

Baseline

Jurisdictional, reassessed 2026

Safeguards

Grievance unverified, FPIC absent, land FAR open

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents