Skip to main content
CDMWindIndiaAMS-I.D

Bannari Amman Spinning Mills Wind Power Project managed by Enercon (India) Ltd.

CDM-4877 ↗

#599of 1935 in Renewable energy#294of 975 in India#401of 1459 in CDM (UNFCCC)#208of 806 in AMS-I.D

5.6/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A CDM wind power project with a VVB-confirmed investment additionality test and a jurisdictional grid baseline, but the validation process generated 17 material findings (9 corrective action requests and 8 clarifications), including a direct challenge to the additionality justification. A contradiction between the validation report and the later monitoring report on the baseline method (project-specific vs. jurisdictional) introduces data-reliability concerns. The project is a low-permanence-risk avoidance type, but the volume of unresolved documentation gaps at validation and the absence of a verified ERR figure limit confidence in the credit claims.

Red Flags

  • 17 material findings at validation (9 CARs + 8 CLs), including CAR 5 which states the justification for benchmark and input parameters for additionality was missing
  • Baseline method contradiction: the 2011 validation report records a project-specific baseline while the 2018 monitoring report records a jurisdictional baseline
  • No verified ERR figure is available in the extracted record; only the lifetime claimed total of 102,457 tCO₂e is present
  • Grid emission factor of 0.9452 tCO₂/MWh is drawn from 2009 data, which is at the start of the crediting period and may not reflect later grid changes

Credit Vintages

IssuedRetiredAvailable
2013
14,753014,753
Total14,753014,753

Risk Indicators

Additionality

VVB-confirmed but CAR 5 questioned benchmark justification

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, reasonable for wind

Baseline

Contradiction between validation and monitoring reports

Safeguards

Safeguards mentioned but no FPIC or grievance mechanism docu

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents